This project consists of constructing roadways and associated water, sewer, and drainage systems for an 8.47 acre manufacturing facility. This is a 62,870 SF manufacturing facility with six loading docks, 6,415 SF of office space, 37,445 SF factory/industrial space, and 19,022 SF of future expansion space. The facility features a concrete reinforced slab with tilt-walls and steel bar joists with 20 RTU units totaling 86 tons of cooling.